Urgent PPE Supplies
£100k per day in revenue safeguarded for major construction materials supplier
The challenge
The solution
Using its strong global links, ABCO was able to source enough masks from our supply network across Europe - but there wasn’t enough space on the airfreight network to secure delivery. We arranged a HGV vehicle with two drivers to complete a 3,000 mile round trip to collect the masks from Portugal so that this major construction giant could continue to support the COVID relief efforts.
Results
- 250k genuine, certified face masks sourced during a time of global crisis
- Bespoke delivery option arranged for a 48 hour turnaround
- £100k per day in revenue safeguarded
“This project is testament to our ethos that there is always a solution. We nurture strong relationships with distribution groups throughout the UK and across Europe so that when it seems no solution is available – we can find one.”
Case Studies
Air Leak Survey
Value add air leak surveys deliver monthly energy savings of £4,000
A global leader in metal packaging wanted to lower their energy usage by identifying air leaks on their line. They wanted to implement an ongoing, proactive air leak survey program but were concerned about the ongoing outsourcing costs.
Urgent PPE Supplies
£100k per day in revenue safeguarded for major construction materials supplier
A leading supplier of construction materials, urgently needed 250k certified face masks so their teams could support government efforts to build temporary hospitals and testing centres during COVID 19. Let down by their usual PPE supplier, they faced revenue losses of £100k per day.The masks needed to be genuine and fully certified and they were needed within a 48-hour timeframe.
5S Workshop
A traceability-led 5S workshop for major automation specialist
A team of automation engineers needed a 24-man workshop that could hold all the tools required to perform maintenance across the processing site of a major UK retailer. The workshop needed to include specific tool kits that were easy to transport, as well as storage and shadow boards that provided total traceability and ease of auditing.
Vending Solutions
Vending machine management delivered £14,000 annual saving for major manufacturer
A leading packaging manufacturer had an existing vending solution, supplied by a major competitor. Service standards began to slip and costs began to creep up. Replenishment was inconsistent, the quality of data was poor and unapproved product swaps were added to vending inventory.